Über diese Übung
Ein Datensatz mit 162 Zeilen auf 2 Tabellenblättern, eine Antwortzelle, etwa 7 Minuten. Bewertet in Ihrem Browser: der Wert und die Formel dahinter, mit Feedback, das die Korrektur benennt.
So lösen Sie die Aufgabe
- F2
=NETWORKDAYS(D2,E2,Holidays!$A$2:$A$13)
NETWORKDAYS(start, end, holidays) counts the days from the start date to the end date that are not Saturdays, Sundays or dates in the holidays list — both the start and the end day are included, so a ticket opened and closed on the same Tuesday counts as 1. The holidays argument is optional, but leaving it out silently over-counts every ticket that was open across a holiday; the list on its own sheet is what keeps the number honest. Locking that range as Holidays!$A$2:$A$13 lets the same formula fill down 150 rows.
Pitfall 1: forgetting the third argument — 122 rows still come out right, which is why the mistake survives review; the grader catches it because 28 rows differ. Pitfall 2: "inclusive" counting — NETWORKDAYS gives 1 for same-day resolution and 5 for Monday to Friday; if the SLA counts elapsed working days instead, subtract 1 (and guard same-day tickets with MAX(0,…)). Pitfall 3: a start date after the end date returns a negative count rather than an error; a text date in the holiday list is ignored silently, so keep that column as real dates. NETWORKDAYS.INTL(start,end,weekend,holidays) handles other weekends: 7 for Friday–Saturday, "0000011" as a 7-character string for a custom pattern; the plain function always assumes Saturday and Sunday. WORKDAY is the inverse: WORKDAY(D2,5,holidays) returns the due date five working days after the opening date — the usual way to compute an SLA deadline. Whole-column references (Holidays!A:A) work and survive additions to the list, but a named range (Formulas → Define Name → Holidays2026) reads better and is less error-prone than a hard-coded $A$2:$A$13.
Andere Wege, die funktionieren
- =NETWORKDAYS.INTL(D2,E2,1,Holidays!$A$2:$A$13) — same result; 1 = Saturday/Sunday weekend
- =NETWORKDAYS(D2,E2,Holidays!A:A) — whole-column holiday reference, grows with the list
- =NETWORKDAYS(D2,E2,Holidays!$A$2:$A$13)-1 — elapsed working days, if your SLA excludes the opening day
Häufige Fehler
Omitting the holidays: =NETWORKDAYS(D2,E2) matches the answer for 122 tickets and is one or two days too high for the 28 tickets that were open across a company holiday.
So bewerten wir
Jede Formel, die das richtige Ergebnis liefert, wird akzeptiert, außer die Aufgabe nennt eine Funktion: Dann bringt eine andere Funktion die halbe Punktzahl. Wir vergleichen Werte mit einer kleinen Toleranz und ignorieren bei Text Groß- und Kleinschreibung sowie Leerzeichen. Eine richtige Zahl, die statt einer Formel von Hand eingetippt wurde, bringt die halbe Punktzahl. Aufgaben mit mehreren Zellen bringen die volle Punktzahl, wenn 100% der Zellen stimmen, und die halbe ab 50%. Wo es darauf ankommt, ändern wir außerdem eine Eingabezelle in einer Kopie Ihrer Tabelle und prüfen, ob Ihre Formel mitzieht.
Antworten nach den Regeln von Excel 365 berechnet und am 16. November 2026 in unserem Bewertungssystem geprüft. Verfasst von GridBelt team.