Sobre este exercício
Um conjunto de dados de 162 linhas em 2 planilhas, uma célula de resposta, cerca de 7 minutos. Corrigido no seu navegador: o valor e a fórmula por trás dele, com feedback que mostra o que corrigir.
Como resolver
- F2
=NETWORKDAYS(D2,E2,Holidays!$A$2:$A$13)
NETWORKDAYS(start, end, holidays) counts the days from the start date to the end date that are not Saturdays, Sundays or dates in the holidays list — both the start and the end day are included, so a ticket opened and closed on the same Tuesday counts as 1. The holidays argument is optional, but leaving it out silently over-counts every ticket that was open across a holiday; the list on its own sheet is what keeps the number honest. Locking that range as Holidays!$A$2:$A$13 lets the same formula fill down 150 rows.
Pitfall 1: forgetting the third argument — 122 rows still come out right, which is why the mistake survives review; the grader catches it because 28 rows differ. Pitfall 2: "inclusive" counting — NETWORKDAYS gives 1 for same-day resolution and 5 for Monday to Friday; if the SLA counts elapsed working days instead, subtract 1 (and guard same-day tickets with MAX(0,…)). Pitfall 3: a start date after the end date returns a negative count rather than an error; a text date in the holiday list is ignored silently, so keep that column as real dates. NETWORKDAYS.INTL(start,end,weekend,holidays) handles other weekends: 7 for Friday–Saturday, "0000011" as a 7-character string for a custom pattern; the plain function always assumes Saturday and Sunday. WORKDAY is the inverse: WORKDAY(D2,5,holidays) returns the due date five working days after the opening date — the usual way to compute an SLA deadline. Whole-column references (Holidays!A:A) work and survive additions to the list, but a named range (Formulas → Define Name → Holidays2026) reads better and is less error-prone than a hard-coded $A$2:$A$13.
Outras formas que funcionam
- =NETWORKDAYS.INTL(D2,E2,1,Holidays!$A$2:$A$13) — same result; 1 = Saturday/Sunday weekend
- =NETWORKDAYS(D2,E2,Holidays!A:A) — whole-column holiday reference, grows with the list
- =NETWORKDAYS(D2,E2,Holidays!$A$2:$A$13)-1 — elapsed working days, if your SLA excludes the opening day
Erros comuns
Omitting the holidays: =NETWORKDAYS(D2,E2) matches the answer for 122 tickets and is one or two days too high for the 28 tickets that were open across a company holiday.
Como corrigimos
Qualquer fórmula que produza o resultado certo é aceita, a menos que a tarefa cite uma função: nesse caso, outra função vale metade da pontuação. Comparamos os valores com uma pequena tolerância e ignoramos maiúsculas e espaços no texto. Um número certo digitado à mão em vez de uma fórmula vale metade da pontuação. Tarefas com várias células valem a pontuação integral com 100% das células certas e metade a partir de 50%. Quando faz diferença, também mudamos uma célula de entrada em uma cópia da sua planilha e verificamos se sua fórmula acompanha.
Respostas calculadas com as regras do Excel 365 e verificadas no nosso corretor em 16 de novembro de 2026. Autor: GridBelt team.